-
Water Treatment
- Water Softeners
- Water Purifiers, Refrigerators, Carbonators
- Accessories and Components for Water Purifiers
-
Water Filters and Components
- Bayonet Water Filters
- Bayonet water filters mixed connection
- Brackets for Housings Containers
- Containers for Filters and Membranes
- Containers for Filters drop-in
- Filtering masses
- Filters and Descaling Systems
- Filters for Bottles
- Filters for Carafes
- Filters for On-Tap
- Filters for osmosis containers
- Keys for Housings Containers
- Line Water Filters
- Osmotic Membranes
- Refillable cartridges
- Sand filter filters for irrigation
- Water Filter Heads
- Water Filters Drop in
- Hydraulic fittings
- Taps and Columns for Water Purifiers
- Co2 Gas Cylinders and Pressure Reducers
- Manual and portable water gas
- Waste treatment
- Beer - Home / Pub
- Christmas Lights and Decorations
- Garden and Outdoors
- Entertainment and Leisure
- Original Gift Ideas and Gadgets
- OUTLET Warehouse
"JT" VACUUM FILTER FOR SANIFICATION
mod. 2Size
PROCEDURE FOR SANIFICATION:
(Recommended every 6 months before filter change)
1. Grasp the center spout at the top of the cartridge and pull it out to pull it out. The nozzle with the entire tube will be removed from the cartridge.
2. Add 2 chlorine tablets to the cartridge through the central hole.
3. Place the nozzle in the cartridge and insert it into the implant head.
4. After attaching the cartridge to its head, slowly open the valve on the water supply line.
Slide the water until you feel an intense smell of the inserted product. Then immediately close the water and wait at least 1/2 hour.
5. Make sure the system is not used during this period to allow for an adequate disinfection time. After finishing, run plenty of water for at least 5 minutes to allow proper rinse of the system and remove any air bubbles inside the cartridge.
6. Remove the sanitizer cartridge and insert a new Everpure cartridge.
"JT" VACUUM FILTER FOR SANIFICATION
mod. 2Size
PROCEDURE FOR SANIFICATION:
(Recommended every 6 months before filter change)
1. Grasp the center spout at the top of the cartridge and pull it out to pull it out. The nozzle with the entire tube will be removed from the cartridge.
2. Add 2 chlorine tablets to the cartridge through the central hole.
3. Place the nozzle in the cartridge and insert it into the implant head.
4. After attaching the cartridge to its head, slowly open the valve on the water supply line.
Slide the water until you feel an intense smell of the inserted product. Then immediately close the water and wait at least 1/2 hour.
5. Make sure the system is not used during this period to allow for an adequate disinfection time. After finishing, run plenty of water for at least 5 minutes to allow proper rinse of the system and remove any air bubbles inside the cartridge.
6. Remove the sanitizer cartridge and insert a new Everpure cartridge.